Real homes. Real numbers. Real fixes.
Case studies and walk-throughs from septic services jobs across Greater Columbus. Specific addresses anonymized; specific numbers preserved.
How-to · 5 min read
Columbus 2026 septic-versus-sewer decision: when conversion is worth the trench
For Greater Columbus and Central Ohio homes within reach of an active sewer main, the convert-or-stay decision turns on five specific variables. Here is the framework, the current grant landscape, and the numbers from a 2026 case-study conversion.
Published July 25, 2026
How-to · 5 min read
Columbus 2026 summer drain-field saturation: what we are seeing and how to triage
Greater Columbus saw above-average May rainfall in 2026 and the predictable wave of drain-field saturation calls is already running. Here is what triggers the saturation, how to triage your own property, and when surface ponding means repair versus full replacement.
Published July 4, 2026
Case study · 5 min read
A Licking County sewer-conversion grant: how the application process actually works
A Johnstown homeowner applied for a Licking County sewer-conversion grant in early 2024 and received approval in 6 weeks. Here is the application package, the eligibility math, and the conversion timeline.
Published June 27, 2026 · Johnstown
Case study · 5 min read
A Delaware County drain field replacement: how the county permit timeline actually works
A Lewis Center homeowner needed a drain field replacement after a complete saturation event. The Delaware Public Health District permit process took 16 days from application to approval. Here is the day-by-day timeline.
Published June 20, 2026 · Lewis Center
Case study · 4 min read
A Galena hillside home: replacing a lift station pump after 11 years
A Galena home with the drain field 18 feet uphill of the tank had a lift station pump fail at age 11. Here is the symptoms timeline, the replacement install, and the maintenance schedule that prevents future surprises.
Published June 13, 2026 · Galena
Case study · 5 min read
A London farm with a 1978 steel septic tank: planning the replacement before it failed
A London farm homeowner had a 47-year-old steel septic tank that was statistically overdue for failure. Rather than wait for an emergency, she scheduled a planned replacement during a routine pump. Here is the install timeline and the cost breakdown.
Published June 6, 2026 · London
Case study · 5 min read
A Powell aerobic treatment unit: what an annual service contract actually catches
A Powell home with an Ohio EPA-permitted aerobic treatment unit had been on the Columbus-area annual service contract for 6 years. Here is the chronological log of what got caught, what got fixed, and what would have failed without the contract.
Published May 30, 2026 · Powell
Case study · 5 min read
A Lewis Center newer-subdivision home running 2-year pump cadence (and why)
A 2009 Lewis Center home with a garbage disposal and a young household of 5 was overdue for pumping at year 4 and showing early signs of solids escape. Here is what got found, why the cadence had to drop to every 2 years, and how the household decided.
Published May 23, 2026 · Lewis Center
Case study · 5 min read
A Sunbury 1990 system: how routine pumping caught a baffle failure before it caused a backup
A Sunbury homeowner scheduled her 4-year pump expecting routine work. The technician found a deteriorated outlet baffle that would have failed within 12 months. The fix added $300 to the visit and avoided a $4,000-$8,000 emergency repair.
Published May 16, 2026 · Sunbury
Case study · 6 min read
An Ostrander lot that failed the perc test: when an aerobic treatment unit becomes the only option
A 1.8-acre lot in Ostrander failed the standard percolation test at 78 minutes per inch. The county would not approve a conventional gravity drain field. Here is the aerobic treatment unit install, the cost, and the ongoing maintenance.
Published May 9, 2026 · Ostrander
Case study · 5 min read
A 1989 Granville septic that backed up on Christmas Eve: what got found in the tank
The homeowner was hosting 14 people. The basement floor drain started gurgling at 4 PM. Here is what the install team found in the tank, what the fix cost, and how to tell whether your system is heading the same direction.
Published May 8, 2026 · Granville
Case study · 5 min read
Switching from septic to city sewer in Pataskala: was it worth it?
Licking County coordinated a sewer-conversion grant program that closed in early 2024. A Pataskala homeowner ran the math, took the grant, and has 18 months of comparable utility data. Here is the actual cost, payback, and three things to handle differently next time.
Published May 7, 2026 · Pataskala
Ready to get started in Columbus?
Routine pumping, emergency response, and full HSTS-permitted installs across Greater Columbus and Central Ohio since 2019, every job performed by an Ohio-registered septic contractor. Mon-Sat 7am-7pm · Emergency 24/7.